I figured out how to calculate the volume. I had to use Geopak tools. I made a terrain model from the excavation limits and used the "Analyze Volumes" tool to figure the difference between the two terrains.
One question that I can't remember how I did it.... clipping/trimming/cutting the excavation mesh to the existing triangle surface. I think I used the "Mesh Subtract" tool but that is not producing the results I want. How to I trim the excavation mesh to the triangle surface?
Thank you.
One question that I can't remember how I did it.... clipping/trimming/cutting the excavation mesh to the existing triangle surface. I think I used the "Mesh Subtract" tool but that is not producing the results I want. How to I trim the excavation mesh to the triangle surface?
Thank you.