Thanks for this Chris - I thought this might be the case. Appreciate the reply.
I am trying to fully integrate our drainage design within our railway alignment design, it seems that InRoads has been doing this for a while, but this is something that I have only just now cottoned on to.
To display pipes and pits as I have specified, will I have to wait for SS4 of Power Rail Track for the Subsurface Utility and Civils Tools ?
↧
RE: Drainage as Solids not working as expected
↧