A few weeks ago, we had to extend the beginning of a roadway centerline and add a horizontal curve. In re-complexing the centerline element, it created an interval that now encompasses the entire element. This interval now dominates the centerline and cannot be re-stationed.
When i export the centerline to native GEOPAK, it exports both the original centerline, and the interval centerline. So i can use the DNC to display the original centerline and stationing, and i thought the problem was moot.
HOWEVER, now we are days away from submittal and i have just realized that the stationing on the exported cross sections is linked to the "interval" baseline, and i cannot find out how to fix it. It is a detailed corridor with hundreds of cross sections, and there is no way i can redo all the work from scratch. My question is:
- Is there any way to "drop" the interval portion of this baseline and retain the original, with the original stationing??