Hi, I have the same issue with a civil cell I am developing for an urban driveway with sidewalks. I wanted the left and right sides of the driveway to touch down on existing ground. To place the profile of the two lines I watched the Driveway Design video and followed the instructions. I cannot seem to get the edge of driveway to place when I test the civil cell. I have tried the advice above but still nothing. Any help would be great. Thanks
↧