Quantcast
Channel: OpenRoads | OpenSite Forum - Recent Threads
Viewing all articles
Browse latest Browse all 15087

MXROAD, Existing string tie to revised alignment

$
0
0

I have design centerline MC00 and design carriegeway CE00 and CE11. After I revised centerline profile levels, now I would existing CE00 and CE11 strings to tie with revised centerline. carriegeway string designed -2.5% slope. Is it possible it? 

Carriegeway strings calculated superelevation, widening etc I dont want re newly design those strings. 


Viewing all articles
Browse latest Browse all 15087

Latest Images

Trending Articles



Latest Images