Quantcast
Channel: OpenRoads | OpenSite Forum - Recent Threads
Viewing all articles
Browse latest Browse all 15087

earthwork

$
0
0

In Geopak Earthwork I have simple cross sections, calculating for fill and a small base, Geo will calculate the (Regular Exc).-Area and Vol –(Embankment) Area and Vol. I know how to do the math to check longhand from Station to Station but if I check longhand with area tool base area and fill, I have to add together and divide by 2 to get answer so that would be Left Base only opposed to lt/rt, and same with fill. Earthwork level shows it picked up a lt/rt calculation. (Why Add together and Divide by two)

 

Ben Clay

Design Technician

 

 


Viewing all articles
Browse latest Browse all 15087

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>